Timeline

Timeline

The Dee CMP has been developed by a partnership of 15 Steering Group members and other representatives of organisations and agencies, as well as individuals who have volunteered to contribute their time and expertise to the process.

STEP 1. In 1999 the Scottish Environment Protection Agency (SEPA) collated the key water-related issues in the catchment into an Issues document. There was an initial public consultation on this document in 1999.

STEP 2. Subsequently a Steering Group was formed to further develop the Dee CMP in light of the European Water Framework Directive and the designation of the River Dee as a Special Area of Conservation.

STEP 3. Three Working Groups were formed to considered the responses to the 1999 consultation, and recommended solutions to the key issues.

STEP 4. These recommendations were collated into the draft Dee Catchment Management Plan which was put out for catchment-wide consultation in autumn 2006. In 2006 the views of the public were sought by the River Dee Catchment Management Plan (CMP) Steering Group on draft proposals for maintaining and improving the water quality of the River Dee and its tributaries.

STEP 5. The draft CMP was reviewed in light of the feedback to the consultation.

STEP 6. The first River Dee CMP was published on 21 November 2007.

Latest News Stories

Do one thing!
Use the minimum amount of water required when you boil water in saucepans and kettles; that way, you'll save energy as well as water!

c/o The Macaulay Institute, Craigiebuckler, Aberdeen AB15 8QH    Tel: 01224 395000

Site content Dee Catchment Partnership © 2008    Website Design: Plexus Media © 2008